News
03/07/2020
Two post-tensioned concrete beams
In order to create a 250 m² meeting room without the support of columns, we built a slab and two beams in post-tensioned concrete on the Twenty 8 site in Belval. A Tracol immobilier SA Groupe Getral project, designed by Beng Architectes Associés with the support of ICB.