SIM Mondercange

Construction of an industrial building

Image
Image
Image
Image
Client
Architect
Design office
Period of realization
2018
Location
Foetz (LU)
Sectors

On its former operating site, CBL completed the walls and roof structural work of an industrial hall in the record time of four months. The building consists of an office section to the front and a warehouse at the rear. It is made up of a concrete structure, façades of concrete or steel sandwich panels with industrial-type exterior joinery. With built-in skylights, the roof is made up of load-bearing metal sheets, insulation and waterproof roofing.